Completed projects

Completed projects from the Tesla Energy Group portfolio

Showing 0 results of 10
Thank you! Your message has been sent.
Oops! Something went wrong while submitting the form.
UCED Kutná Hora, CZ
4 MW / 4.472 MWh, 2025
Utilities
KKS Hungary, Hungary
3.992 MW / 13.416 MWh, 2025
Renewables
ASEKOL – ENVIROPOL, Jihlava, CZ
200 kW / 466 kWh, 2024
Utilities
KOBERCE BRENO, CZ
300 kW / 360 kWh, 2024
Industry
MECOM GROUP, Lučenec, SK
340 kW / 688 kWh, 2022
District heating
Okoličné HPP, SK
550 kW / 1.118 MWh, 2022
Renewables
INFINITY GROUP, Vígľaš, SK
100 kW / 186 kWh, 2023
Renewables
HMC Invest, Vlkanová, SK
3.78 MW / 5.589 MWh, 2023
Utilities
SSE – EGEM, Panické Dravce, SK
1.25 MW / 1.398 MWh, 2024
Utilities
ENSTRA, Zvolen, SK
550 kW / 1.118 MWh, 2023
District heating
MG Power, Velká Bíteš, CZ
10 MW / 26.8 MWh, 2026
Utilities
MG Power, Kuřim, CZ
3 MW / 6.7 MWh, 2025
Utilities
Žipotín, CZ
3× 1 MW / 3× 2.236 MWh, 2025
Renewables
DALU / TRCZ, Lovosice, CZ
1 MW / 1.3 MWh, 2024
Industry
TRAFIN OIL, Horní Suchá, CZ
200 kW / 466 kWh, 2025
Industry
Evora Smart, Dolní Morava, CZ
3 MW / 7.33 MWh, 2026
A crane installs a containerized battery storage system onto a concrete foundation at a photovoltaic power plant.
In progress
Industry
Teplárny Brno, CZ
4 MW / 11.4 MWh, 2026
A crane installs a containerized battery storage system onto a concrete foundation at a photovoltaic power plant.
In progress
District heating
TEDOM Energie, Avia Letňany, CZ
1 MW / 4 MWh, Q1/2027
A crane installs a containerized battery storage system onto a concrete foundation at a photovoltaic power plant.
In progress
District heating
Hanácká zemědělská společnost, Jevíčko, CZ
1 MW / 2.4 MWh, 2026
A crane installs a containerized battery storage system onto a concrete foundation at a photovoltaic power plant.
In progress
Industry
MMV, Ostrava-Vítkovice, CZ
1 MW / 3.344 MWh, Q3/2027
A crane installs a containerized battery storage system onto a concrete foundation at a photovoltaic power plant.
In progress
Industry
OKD – ČSM Sever, Stonava, CZ
20 MW / 60 MWh, 2027
A crane installs a containerized battery storage system onto a concrete foundation at a photovoltaic power plant.
In progress
Utilities
E.GD, Zlín – Malenovice, CZ
3 MW / 10 MWh, Q1/2027
A crane installs a containerized battery storage system onto a concrete foundation at a photovoltaic power plant.
In progress
Utilities
E.GD, Vimperk, CZ
2 MW / 6.68 MWh, Q3/2027
A crane installs a containerized battery storage system onto a concrete foundation at a photovoltaic power plant.
In progress
Utilities