About the project

INFINITY GROUP a.s., based in Vígľaš, is focused on improving the energy efficiency of its site. We implemented a GAMA 186 battery storage system designed to work alongside a 300 kWp photovoltaic plant.

100 kW
Performance
186 kWh
Capacity
2023
Year

Project background and objectives

INFINITY GROUP a.s., based in Vígľaš, Slovakia, is focused on improving the energy efficiency of its site. As part of modernising its energy management, a GAMA 186 battery storage system was implemented, designed to work alongside a 300 kWp photovoltaic plant. The aim of the solution is to optimise the use of generated energy, manage peak demand effectively and ensure high power quality.

Solution and technical specification

The selected GAMA 186 battery storage system offers the following key parameters:

  • Power: 100 kW
  • Capacity: 186 kWh

Despite its compact power rating, the solution was chosen for its sufficient energy storage capacity and effective peak demand management. It is ideally suited to the specific needs of the site, where maximising the use of solar-generated energy is essential.

Functionality and benefits

  • Peak demand optimisation (peak shaving): the storage system effectively balances the load on the distribution grid, helping to reduce costs and improve supply stability.
  • Maximum use of generated energy: surplus solar energy is stored efficiently, increasing the site's energy self-sufficiency.
  • Improved power quality: advanced control of battery charging and discharging ensures a stable, high-quality energy supply.
  • Future expansion: the system's flexibility makes it possible to add further storage or expand the system as the company's needs grow.

Control software and integration

Modern control software was implemented to ensure seamless integration between the battery storage system and the photovoltaic system. It monitors battery status, optimises charging and discharging, and ensures that generated energy is used efficiently on site. This delivers maximum efficiency and safety for the entire system.

Outcome and outlook

By implementing the GAMA 186 battery storage system, INFINITY GROUP a.s. has gained a modern, efficient and sustainable solution that:

  • optimises energy consumption and reduces peak demand costs,
  • ensures maximum use of solar energy through close integration with the photovoltaic plant,
  • increases the energy self-sufficiency and stability of the entire system,
  • offers options for future expansion in line with current and future needs.

The project is an inspiring example of how modern technology can be used to improve efficiency and sustainability in energy management.

Share case study
Need advice?

Project gallery

This project does not have any photos in the gallery yet.
TESLA Energy Group a.s.

Battery storage tailored to your project

From design and production to service — everything under one roof. Get a no-obligation quote tailored to your operations.
European manufacturing
Tailored solutions
24/7 support
ISO certified
Modular system
In-house dispatch center
Join 50+ satisfied customers

Other projects

Take a look at our other completed projects

ASEKOL – ENVIROPOL, Jihlava, CZ
200 kW / 466 kWh, 2024
E.GD, Zlín – Malenovice, CZ
3 MW / 10 MWh, Q1/2027
A crane installs a containerized battery storage system onto a concrete foundation at a photovoltaic power plant.
In progress