E.GD, Zlín – Malenovice, CZ

Turnkey 3 MW / 10 MWh battery energy storage system for E.ON Energy Solutions / EG.D at the Local Energy site in Zlín.

About the project

At the Zlín – Malenovice location, on the Local Energy site, we are preparing a battery storage system with an output of 3 MW and a capacity of 10 MWh for investors E.ON Energy Solutions, s.r.o. / EG.D, s.r.o.

The project is designed as a complete turnkey delivery and uses EVE battery modules. The battery system will primarily provide commercial and technical flexibility and balancing services. The project is structured as an EPCM contract.

3 MW
Performance
10 MWh
Capacity
Q1/2027
Year

Project context

The project in Malenovice expands the site's energy infrastructure with a large-scale battery system that will operate as a fast, controllable flexible resource.

The BESS will make it possible to work with power and capacity according to the current needs of the energy market and the power grid. This means the system can be used not only for energy storage itself but also for active power control and the provision of flexibility.

Commercial and technical flexibility

The battery storage system can be used in several operating modes depending on the current market situation and the needs of the energy system.

The system is designed for:

  • commercial flexibility,
  • technical flexibility,
  • balancing services,
  • fast control of charging and discharging power.

This allows the BESS to act as an active asset that adapts to changing conditions and makes efficient use of the available battery power and capacity.

Balancing services

One of the main use cases will be the participation of the battery system in balancing services.

Battery technology is particularly well suited to this purpose thanks to its ability to respond quickly to changes in the required power and to control charging and discharging precisely.

The project therefore creates the technological basis for active participation in the power system and the provision of flexibility according to current operational needs.

Complete turnkey delivery

The project is being prepared as a comprehensive turnkey project, with the aim of handing over to the investor a fully functional battery system ready for operation.

The solution covers not only the battery technology itself but also its integration into the site's energy infrastructure and the commissioning of the entire system.

Share case study
Need advice?
TESLA Energy Group a.s.

Battery storage tailored to your project

From design and production to service — everything under one roof. Get a no-obligation quote tailored to your operations.
European manufacturing
Tailored solutions
24/7 support
ISO certified
Modular system
In-house dispatch center