TEDOM Energie, Avia Letňany, CZ

1 MW / 4 MWh battery energy storage system at the Avia Letňany site, integrated with the investor's CHP units.

About the project

For TEDOM Energie, we are delivering a battery storage system with an output of 1 MW and a capacity of 4 MWh at the Avia Letňany site.

The system uses EVE battery modules and is located at an important energy site where the investor also operates several CHP units.

The battery storage system expands the site's energy management options and creates an additional flexible resource that can be used for electricity trading and for providing technical flexibility services.

1 MW
Performance
4 MWh
Capacity
Q1/2027
Year

Project context

The Avia Letňany site already uses several CHP units operated by the investor.

Adding a battery storage system creates a more flexible energy system in which electricity generation from cogeneration can be combined with fast, controllable storage.

The battery makes it possible to respond to the current situation on site and to energy market requirements, expanding the ways in which the existing energy infrastructure can be used.

Technical solution

The system is built around a battery storage system with an output of 1 MW and a capacity of 4 MWh using EVE battery modules.

Key parameters

  • power: 1 MW,
  • capacity: 4 MWh,
  • battery technology: TESLA BESS container with EVE cells,
  • location: Avia Letňany,
  • use: commercial and technical flexibility.

Integration with CHP units

Locating the battery at a site with several CHP units creates favourable conditions for efficient energy management.

CHP units are a controllable source of electricity generation, while the battery can respond very quickly to changes in power and the needs of the energy system.

Combining these technologies therefore increases the overall flexibility of the site.

Commercial and technical flexibility

TEDOM acts as a flexibility aggregator and will use the battery storage system to trade its power and capacity.

The battery can be used in particular for:

  • commercial optimisation on energy markets,
  • capturing electricity price spreads,
  • providing technical flexibility,
  • rapid response to power system requirements.

Thanks to its fast response and precise power control, the battery storage system is an ideal addition to an aggregated portfolio of flexible resources.

Project outcome

The 1 MW / 4 MWh battery storage system expands the existing energy infrastructure of the Avia Letňany site with a significant storage and flexibility asset.

The project combines EVE battery technology, cogeneration sources and TEDOM's experience in flexibility aggregation.

The result is an energy system ready for active commercial use of the battery and the provision of technical flexibility to the power system.

Share case study
Need advice?
TESLA Energy Group a.s.

Battery storage tailored to your project

From design and production to service — everything under one roof. Get a no-obligation quote tailored to your operations.
European manufacturing
Tailored solutions
24/7 support
ISO certified
Modular system
In-house dispatch center
Join 50+ satisfied customers

Other projects

Take a look at our other completed projects

ASEKOL – ENVIROPOL, Jihlava, CZ
200 kW / 466 kWh, 2024
UCED Kutná Hora, CZ
4 MW / 4.472 MWh, 2025