About the project

For Hanácká zemědělská společnost Jevíčko a.s., a member of the AGRO 2000 group, we are delivering an industrial battery storage system with an output of 1 MW and a capacity of 2.4 MWh. The aim of the project was to add a flexible asset to the site's energy system that makes it possible to optimise the load profile, reduce power peaks and make better use of reserved capacity. At the same time, the battery storage system is ready for broader commercial use, particularly in balancing services and commercial flexibility.

1 MW
Performance
2.4 MWh
Capacity
2026
Year

Project context

The energy profile of agricultural and industrial sites is characterised by variable loads and differing power requirements throughout the day.

A battery storage system makes it possible to respond actively to these changes and to manage electricity consumption so that the site operates more efficiently and predictably.

The project in Jevíčko therefore combines two main objectives:

  • optimisation of the local energy system,
  • use of the battery as a tradable flexible resource.

Technical solution

The project is built around a TESLA battery storage system with an output of 1 MW and a capacity of 2.4 MWh.

Key technical parameters

  • power: 1 MW,
  • capacity: 2.4 MWh,
  • design: TESLA industrial BESS,
  • integration: into the site's energy system,
  • use: load management, peak shaving, reserved capacity optimisation and flexibility.

The delivery also included the supply of associated equipment, complete installation, commissioning and integration of the battery system into the site's existing energy infrastructure.

Load profile management

One of the main functions of the battery storage system is active management of the load profile.

The battery can respond to instantaneous changes in the site's load and supply part of the required power during periods of higher consumption.

This makes it possible to:

  • smooth the load profile,
  • limit short-term power peaks,
  • make more efficient use of the available grid connection capacity,
  • reduce the load on the site's energy infrastructure.

Peak shaving and reserved capacity

The battery system makes it possible to limit maximum grid draw in a targeted way.

Whenever the site's consumption is heading towards a higher power peak, the battery can supply the necessary power and thereby reduce the draw from the grid.

This creates scope for optimising reserved capacity and managing the energy costs associated with running the site more efficiently.

Local savings and commercial flexibility

A key strength of the project is the combination of two ways of using a single battery system.

On the one hand, the BESS is used to optimise the local energy system and manage the site's consumption.

On the other hand, its spare power and capacity can be used for:

  • balancing services,
  • commercial flexibility,
  • other forms of controlled battery use on energy markets.

The battery storage system can therefore generate value not only through savings at the point of consumption but also through active commercial use.

A flexible energy asset

The 1 MW BESS acts as a fast, controllable asset whose operation can be adapted to the site's current needs.

Depending on the situation, its priority can be to:

  • support the site's own energy operations,
  • limit consumption peaks,
  • optimise reserved capacity,
  • provide flexibility to the energy market.

It is precisely the ability to combine several operating modes that increases the overall utilisation of the battery system.

Project outcome

The result is a 1 MW / 2.4 MWh battery storage system that expands the energy system of Hanácká zemědělská společnost with an actively controlled flexible resource.

The project makes it possible to:

  • optimise the load profile,
  • reduce power peaks,
  • make more efficient use of reserved capacity,
  • manage the site's energy operations,
  • use the battery for balancing services and commercial flexibility.

The result is a flexible energy solution that combines local optimisation of consumption with the possibility of actively using the battery on energy markets.

Share case study
Need advice?
TESLA Energy Group a.s.

Battery storage tailored to your project

From design and production to service — everything under one roof. Get a no-obligation quote tailored to your operations.
European manufacturing
Tailored solutions
24/7 support
ISO certified
Modular system
In-house dispatch center
Join 50+ satisfied customers

Other projects

Take a look at our other completed projects

E.GD, Zlín – Malenovice, CZ
3 MW / 10 MWh, Q1/2027
A crane installs a containerized battery storage system onto a concrete foundation at a photovoltaic power plant.
In progress
ENSTRA, Zvolen, SK
550 kW / 1.118 MWh, 2023